NEW PROJECTS ADVERTISED SINCE Jul 22 2014 1:07PM
Multi-RAE Pro and Cradle Irvine, CA 07/25/14
11:00 AM

Fitness Equipment Functional Movement Test Kits Irvine, CA 07/29/14
11:00 AM

On-Call CCTV Inspection Sacramento , CA 07/30/14
2:00 PM

Frederick Avenue and Olive Avenue Resurfacing (West Ripon Road to North End) Ripton, CA 07/31/14
1:30 PM

Lemon Avenue and Orange Avenue Resurfacing (Harrold Avenue to Sutliff Avenue; Santa Fe Road to Sutliff Avenue) Escalon, CA 07/31/14
1:30 PM

Lower Sacramento Road Improvements (Eight Mile Road to South of Harney Curve) Various Locations, CA 07/31/14
1:30 PM

Floor Care Services at Silver Creek Community Center Bakersfield, CA 07/31/14
2:00 PM

Provide On-Call Environmental Support Services for Various Capital Improvements Projects 2014-2017 Vacaville, CA 07/31/14
4:00 PM

STORM DRAIN PIPE LINING PROJECT Laguna Niguel, CA 08/01/14
2:00 PM

FY15 Vegetation Road Clearance Project Santa Barbara, CA 08/04/14
2:00 PM

EL DORADO RANCH PARK LANDSCAPING AND IRRIGATION PROJECT Yucaipa, CA 08/05/14
10:00 AM

FFIP Sleepy Hollow Pipeline Replacement Project Sleepy Hollow, CA 08/05/14
10:00 AM

King Street Improvements Project - Phase 1 La Mesa, CA 08/05/14
11:00 AM

Station Modifications for UTDC Light Rail Vehicles Re-Bid Sacramento , CA 08/06/14
2:00 PM

Enhance Airfield Drainage (Phase 2) BOULDER CITY, NV 08/07/14
1:00 PM

Putah Creek Parkway Davis, CA 08/07/14
2:00 PM

DMV Riverside Roof Replacement Riverside, CA 08/07/14
2:30 PM

(Subcontractor Prequalification) Main Operating Rooms HVAC Upgrades La Jolla, CA 08/08/14
1:00 PM

Topaz Lane Bridge Maintenance Project Topaz, CA 08/11/14
3:00 PM

2014 Street Resurfacing Project - City Project No. 2014-01 Livermore, CA 08/12/14
2:30 PM

Civic Center Playground Shade Structure Replacement Palm Desert, CA 08/13/14
2:00 PM

Kennedy High School Health Clinic Richmond, CA 08/13/14
2:00 PM

RTC Administration Building - Safety and Security Upgrades Las Vegas, CA 08/13/14
4:00 PM

13-6796: CHESTNUT AVE. CLASS II BIKEWAY; STANDARD AVE TO GRAND AVE; CM-5063(148) 14-6813: ALLEY IMPROVEMENT-FY 13/14 14-6803: CHESTNUT AVE REHABILITATION; BROADWAY TO MAIN SANTA ANA, CA 08/14/14
2:00 PM

City of Perris 2014 Pavement Rehabilitation & Flood Benefit Zone Rehabilitation Project Perris, CA 08/14/14
2:00 PM

COGENERATION ENGINE NO. 1 OVERHAUL AND SOURCE TEST Stockton, CA 08/14/14
2:00 PM

D Street Roadway Enhancements Phase 6 Railroad Track to 10th Street Perris, CA 08/18/14
2:00 PM

Vera Johnson Manor A (AMP 313) Windows Upgrades 1200 Harris Avenue Las Vegas, NV. 89101 Las Vegas, NV 08/20/14
10:00 AM

Corporation Yard Expansion Phase 2 - Materials Bin Storage Facility Project (WFC003) Elk Grove, CA 08/21/14
2:00 PM

Sewer Annexation 459A & 459C Porterville , CA 08/21/14
2:00 PM

Sixth Street Improvements, LED Trail Lighting, LED Upgrades, and Fiber Optic Repair Gilroy, CA 08/21/14
2:00 PM

Underground District No. 57 Phase 2 Anaheim, CA 08/21/14
2:00 PM

Spencer Street, Windmill Lane to Warm Springs Road & Serene Avenue, Spencer Street to Eastern Avenue Las Vegas, NV 08/21/14
2:15 PM

First Street Water Line Replacement Project Simi Valley, CA 08/21/14
2:30 PM

Exterior Lighting Atascadero, CA 08/21/14
3:00 PM

(Prequalified Contractors) Old Town Phase I Demolition Berkeley, CA 08/25/14
3:00 PM

CALAVERA HILLS AND STAGECOACH COMMUNITY PARKS ATHLETIC FIELDS LIGHTING RETROFITS Carlsbad, CA 08/26/14
2:00 PM

SR 89 Mousehole Multi-Use Path and UPRR Undercrossing Truckee, CA 08/28/14
2:00 PM

2300 Delaware Elevators No. 72 and 73 Modernization Santa Cruz, CO 09/09/14
3:00 PM

NEW PLANS/SPECS ADDED SINCE Jul 22 2014 1:07PM
Lake Tahoe Blvd Enhancement Project South Lake Tahoe, CA 07/28/14
2:00 PM

Northern California Diving Services Various Locations, CA 07/28/14
2:00 PM

Fitness Equipment Functional Movement Test Kits Irvine, CA 07/29/14
11:00 AM

VIDA Site Administration Improvements Vista, CA 07/30/14
10:00 AM

Frederick Avenue and Olive Avenue Resurfacing (West Ripon Road to North End) Ripton, CA 07/31/14
1:30 PM

Lemon Avenue and Orange Avenue Resurfacing (Harrold Avenue to Sutliff Avenue; Santa Fe Road to Sutliff Avenue) Escalon, CA 07/31/14
1:30 PM

Lower Sacramento Road Improvements (Eight Mile Road to South of Harney Curve) Various Locations, CA 07/31/14
1:30 PM

2014 Residential Street Resurfacing Project Citrus Heights, CA 07/31/14
2:00 PM

Floor Care Services at Silver Creek Community Center Bakersfield, CA 07/31/14
2:00 PM

Water Yard Security Gate Improvement Project Orange, CA 07/31/14
2:00 PM

Provide On-Call Environmental Support Services for Various Capital Improvements Projects 2014-2017 Vacaville, CA 07/31/14
4:00 PM

STORM DRAIN PIPE LINING PROJECT Laguna Niguel, CA 08/01/14
2:00 PM

FY15 Vegetation Road Clearance Project Santa Barbara, CA 08/04/14
2:00 PM

Linda Mar Generator Replacement Project Pacifica, CA 08/04/14
2:00 PM

FFIP Sleepy Hollow Pipeline Replacement Project Sleepy Hollow, CA 08/05/14
10:00 AM

LANDSCAPE MANAGEMENT/MAINTENANCE SERVICES FOR THE YUCAIPA HISTORIC UPTOWN PBID (YHUPBID) Yucaipa, CA 08/05/14
10:00 AM

Grading and Check Dam Construction Along 16th Street at Tennessee Street Yuciapa, CA 08/05/14
11:00 AM

King Street Improvements Project - Phase 1 La Mesa, CA 08/05/14
11:00 AM

Drainage Pump Stations No. 3 & No. 7 Improvements Project Novato, CA 08/05/14
2:00 PM

Place HMA, Repair Failed Areas, and Construct Guard Railing Various Locations, CA 08/06/14
2:00 PM

Castle Airport Electrical Vault Building and Electrical Castle Improvements Project Atwater, CA 08/07/14
10:00 AM

SAN FERNANDO ELEMENTARY SCHOOL CA 08/07/14
10:00 AM

Enhance Airfield Drainage (Phase 2) BOULDER CITY, NV 08/07/14
1:00 PM

AHF & BHF INDICATOR WELL TELEMETRY, MIDDLEFIELD RESERVOIR ISOLATION VALVE AUTOMATION, AND PATTERSON RESERVOIR VALVE ACTUATORS, Job 21009, 21058, 21102 Fremont, CA 08/07/14
2:00 PM

Hubbs Hall VAV Retrofit La Jolla, CA 08/07/14
2:00 PM

Putah Creek Parkway Davis, CA 08/07/14
2:00 PM

DMV Riverside Roof Replacement Riverside, CA 08/07/14
2:30 PM

Castle Airport Hangar Improvements Project Atwater, CA 08/07/14
3:00 PM

WTP NO. 2 POWER FACILITY TURBINE UPGRADE Fremont, CA 08/07/14
3:00 PM

(Subcontractor Prequalification) Main Operating Rooms HVAC Upgrades La Jolla, CA 08/08/14
1:00 PM

Topaz Lane Bridge Maintenance Project Topaz, CA 08/11/14
3:00 PM

2014 Street Resurfacing Project - City Project No. 2014-01 Livermore, CA 08/12/14
2:30 PM

Civic Center Playground Shade Structure Replacement Palm Desert, CA 08/13/14
2:00 PM

RTC Administration Building - Safety and Security Upgrades Las Vegas, CA 08/13/14
4:00 PM

City of Perris 2014 Pavement Rehabilitation & Flood Benefit Zone Rehabilitation Project Perris, CA 08/14/14
2:00 PM

COGENERATION ENGINE NO. 1 OVERHAUL AND SOURCE TEST Stockton, CA 08/14/14
2:00 PM

COMMERCIAL POOL SERVICE AT MULTIPLE POOL FACILITIES Stockton, CA 08/14/14
2:00 PM

D Street Roadway Enhancements Phase 6 Railroad Track to 10th Street Perris, CA 08/18/14
2:00 PM

2014 SLURRY SEAL PROJECT CARLSBAD, CA 08/19/14
2:00 PM

Vera Johnson Manor A (AMP 313) Windows Upgrades 1200 Harris Avenue Las Vegas, NV. 89101 Las Vegas, NV 08/20/14
10:00 AM

Corporation Yard Expansion Phase 2 - Materials Bin Storage Facility Project (WFC003) Elk Grove, CA 08/21/14
2:00 PM

Sewer Annexation 459A & 459C Porterville , CA 08/21/14
2:00 PM

Sixth Street Improvements, LED Trail Lighting, LED Upgrades, and Fiber Optic Repair Gilroy, CA 08/21/14
2:00 PM

Underground District No. 57 Phase 2 Anaheim, CA 08/21/14
2:00 PM

Spencer Street, Windmill Lane to Warm Springs Road & Serene Avenue, Spencer Street to Eastern Avenue Las Vegas, NV 08/21/14
2:15 PM

Exterior Lighting Atascadero, CA 08/21/14
3:00 PM

(Prequalified Contractors) Old Town Phase I Demolition Berkeley, CA 08/25/14
3:00 PM

CALAVERA HILLS AND STAGECOACH COMMUNITY PARKS ATHLETIC FIELDS LIGHTING RETROFITS Carlsbad, CA 08/26/14
2:00 PM

SR 89 Mousehole Multi-Use Path and UPRR Undercrossing Truckee, CA 08/28/14
2:00 PM

2300 Delaware Elevators No. 72 and 73 Modernization Santa Cruz, CO 09/09/14
3:00 PM

NEW ADDENDA ADDED SINCE Jul 22 2014 1:07PM
Airport Neighborhood Sewer Improvement Project Modesto, CA 07/23/14
2:30 PM

Town Hall Heating Ventilation and Air Conditioning Improvement Project Truckee, CA 07/23/14
3:00 PM

SIEGFRIED & ROY PARK Las Vegas, NV 07/24/14
1:30 PM

Bare Non-Operated Rental Self Propelled Asphalt Equipment Various Locations, CA 07/24/14
2:15 PM

Moore Road Sewer Lincoln, CA 07/25/14
3:00 PM

West Central Landfill Phase I Underdrain Pump Station Redding, CA 07/28/14
11:00 AM

Chassis Wash Bus Lift Replacement Project Riverside, CA 07/29/14
2:00 PM

North Avenue Bridge Preventative Maintenance Project Lompoc, CA 07/29/14
2:00 PM

Welcome to Las Vegas Sign Parking Lot Improvements Las Vegas, NV 07/29/14
2:15 PM

Original Ranch Buildings - Hay Barn Restoration Santa Cruz, CA 07/29/14
3:00 PM

Furnish and Install Baseball Scoreboard at Morse High School San Diego , CA 07/30/14
1:00 PM

2012-2013 Wheelchair Ramp Installation/Improvement and Concrete Work at Various Locations Buena Park, CA 07/30/14
2:00 PM

Bayshore Bikeway Segment 4 Various Locations, CA 07/30/14
2:00 PM

Ralston Avenue Sanitary Sewer Replacement Project (Between Notre Dame Avenue and South Road) Belmont, CA 07/30/14
2:00 PM

General Contracting Services or Subcontractor Services TCMC Primary Care Physician Clinic Vista Vista, CA 07/30/14
3:00 PM

2014 Sidewalk Removal and Replacement Project San Carlos, CA 07/31/14
10:00 AM

2014 Residential Street Resurfacing Project Citrus Heights, CA 07/31/14
2:00 PM

Live Scan Systems Santa Ana, CA 07/31/14
4:00 PM

Place HMA, Repair Failed Areas, and Construct Guard Railing Various Locations, CA 08/06/14
2:00 PM

Castle Airport Electrical Vault Building and Electrical Castle Improvements Project Atwater, CA 08/07/14
10:00 AM

Gymnasium Maintenance and Repair Service Fremont, CA 08/07/14
2:00 PM

Demolition and Clearance at Lake 20 & 29, Parcel #12288 Upper Lake, CA 08/07/14
2:15 PM

Hesperian/ Springlake Railroad Crossing Improvements San Leandro, CA 08/07/14
3:00 PM

NEW PLANHOLDERS ADDED SINCE Jul 22 2014 1:07PM
Airport Neighborhood Sewer Improvement Project Modesto, CA 07/23/14
2:30 PM

Applied Water Pumps Replacement at the Water Quality Control Plant Simi Valley, CA 07/23/14
3:30 PM

2014 Summer Parking Lot/Road Repair at Riverside City College - REBID Riverside , CA 07/24/14
2:00 PM

NRW Collection System Repairs Phase IV and Sewer Collection System Manhole Rehabilitation Various Locations, CA 07/24/14
2:00 PM

Elk Grove Landfill Final Cover Repairs and GCCS Improvement Plan Elk Grove, CA 07/24/14
2:30 PM

Atherton Tank Rehabilitation Project Novato, CA 07/24/14
3:00 PM

LMD 87-1 VARIABLE FREQUENCY DRIVE PUMP REPLACEMENT City of Poway, CA 07/24/14
3:00 PM

Pepper Avenue and Birch Avenue Widening City Project No. 130811 Pepper Avenue Sound Walls and Pepper Avenue Overlay City Project No. 000893 Rialto, CA 07/24/14
3:00 PM

West Central Landfill Phase I Underdrain Pump Station Redding, CA 07/28/14
11:00 AM

Water Treatment Analysis and Supply Various Locations, CA 07/28/14
2:00 PM

Calico Ghost Town Regional Park Water Treatment System Project Yermo, CA 07/29/14
10:00 AM

Led Crosswalk Installation at Orr And Day Road and Whiteland Street Santa Fe Springs, CA 07/29/14
11:00 AM

Restoration and Painting of Talmadge Acorn Streetlights San Diego , CA 07/29/14
1:30 PM

East Zayante Road PM 6.22 Storm Damage Repair Project Santa Cruz Unincorporated, CA 07/29/14
2:00 PM

Highland Way PM 0.38 Storm Damage Repair Project Los Gatos, CA 07/29/14
2:00 PM

North Avenue Bridge Preventative Maintenance Project Lompoc, CA 07/29/14
2:00 PM

Rose Ave./Collins St. Pedestrian Improvements Oxnard, CA 07/29/14
2:00 PM

Skylark Canyon Sewer Rehabilitation San Diego , CA 07/29/14
2:00 PM

Standby Generator Addition 56th St. Booster Station and Armstrong Booster Station Jurupa Valley, CA 07/29/14
2:00 PM

TRANSIT CENTER PHASE II IMPROVEMENTS STORM DRAIN AND ROUGH GRADING PLANS Yucaipa, CA 07/29/14
2:00 PM

Leanna Drive Creek Crossing Waterline Arroyo Grande, CA 07/29/14
3:00 PM

Alton Parkway Left Turn Lane at the Civic Center Irvine, CA 07/30/14
10:00 AM

Preece Street Storm Drain Replacement San Diego , CA 07/30/14
1:30 PM

C1494F BLDG. R DOOR REPLACEMENT (LAC) Long Beach, CA 07/30/14
2:00 PM

On-Call CCTV Inspection Sacramento , CA 07/30/14
2:00 PM

PACIFIC COAST HIGHWAY / DEL PRADO STREETSCAPE IMPROVEMENT PROJECT PHASE 2A Dana Point, CA 07/30/14
2:00 PM

Ralston Avenue Sanitary Sewer Replacement Project (Between Notre Dame Avenue and South Road) Belmont, CA 07/30/14
2:00 PM

Rehabilitate Runway and Taxiway Lighting and Signage Stockton, CA 07/30/14
2:00 PM

Sacramento City College Ped/Bike Bridge (Phase 3) Sacramento , CA 07/30/14
2:00 PM

Vienna Drive at Mesa Drive Storm Damage Repair Project Santa Cruz Unincorporated, CA 07/30/14
2:00 PM

CONSTRUCTION OF MADISON STREET AND SKYPARK DRIVE RECONSTRUCTION, I-122 AND MEADOW PARK PARKING LOTS REHABILITATION, I-118 Torrance, CA 07/30/14
3:00 PM

PURCHASE, DELIVERY & INSTALLATION OF 2 KODAK I4600 SCANNERS Santa Ana, CA 07/30/14
4:00 PM

ROSEMEAD BOULEVARD PEDESTRIAN BRIDGE REHABILITATION AND BEAUTIFICATION Pico Rivera, CA 07/31/14
8:00 AM

2014 Residential Street Resurfacing Project Citrus Heights, CA 07/31/14
2:00 PM

Axford Alley Improvement Project Santa Cruz, CA 07/31/14
2:00 PM

Crescenta Valley High School Pool Area Concrete Restoration and Sealcoating La Crescenta, CA 07/31/14
2:00 PM

Humanities Secondary Effect San Marcos, CA 07/31/14
2:00 PM

North Rodeo Gulch PM 4.75 Storm Damage Repair Project Santa Cruz Unincorporateds, CA 07/31/14
2:00 PM

Water System Improvement Project 2013 - Phase 2 Cloverdale, CA 07/31/14
2:00 PM

Clear Creek Wastewater Treatment Plant Biosolids Dewatering Project Redding, CA 07/31/14
3:00 PM

Sycamore Canyon Rd Bank Repair Santa Barbara, CA 07/31/14
3:00 PM

Live Scan Systems Santa Ana, CA 07/31/14
4:00 PM

NUT TREE AIRPORT RUNWAY 2-20 THRESHOLD SHIFT AND TAXIWAY K CONSTRUCTION Vacaville, CA 08/01/14
2:00 PM

STORM DRAIN PIPE LINING PROJECT Laguna Niguel, CA 08/01/14
2:00 PM

FY15 Vegetation Road Clearance Project Santa Barbara, CA 08/04/14
2:00 PM

EL DORADO RANCH PARK LANDSCAPING AND IRRIGATION PROJECT Yucaipa, CA 08/05/14
10:00 AM

LANDSCAPE MANAGEMENT/MAINTENANCE SERVICES FOR THE YUCAIPA HISTORIC UPTOWN PBID (YHUPBID) Yucaipa, CA 08/05/14
10:00 AM

Grading and Check Dam Construction Along 16th Street at Tennessee Street Yuciapa, CA 08/05/14
11:00 AM

King Street Improvements Project - Phase 1 La Mesa, CA 08/05/14
11:00 AM

Storm Water Mitigation Various Locations, CA 08/05/14
2:00 PM

Corona Mall Pavement Rehabilitation, Project No. 2014-11 Corona, CA 08/05/14
2:00 PM

NWP Rail Trail Phase I Construction Ukiah, CA 08/05/14
2:00 PM

Wharf 1 Utility Pipe Hangers Monterey, CA 08/05/14
2:00 PM

FURNISH AND INSTALL NEW CARPET TILES Floors 3 & 5 San Francisco, CA 08/05/14
3:00 PM

Palo Alto Airport Pavement Rehabilitation of Runway 13-31 and Taxiways FAA AIP NO.: 3‐06‐0182‐009 Palo Alto, CA 08/05/14
3:00 PM

(Prequalification of Contractors) Stein Clinical Research BSL-3 Lab, 4th Floor La Jolla, CA 08/05/14
4:00 PM

Magnolia Avenue Trunk Line Rehabilitation Project Larkspur, CA 08/06/14
2:00 PM

CITY FACILITIES ROOFING 2014/2015 City of Poway, CA 08/06/14
3:00 PM

PREQUALIFICATION: JULES STEIN SEISMIC CORRECTION AND PROGRAM IMPROVEMENTS RE-ADVERTISED Los Angeles, CA 08/06/14
3:00 PM

Castle Airport Electrical Vault Building and Electrical Castle Improvements Project Atwater, CA 08/07/14
10:00 AM

FLORA VISTA DOG PARK Bellflower, CA 08/07/14
11:00 AM

Enhance Airfield Drainage (Phase 2) BOULDER CITY, NV 08/07/14
1:00 PM

AHF & BHF INDICATOR WELL TELEMETRY, MIDDLEFIELD RESERVOIR ISOLATION VALVE AUTOMATION, AND PATTERSON RESERVOIR VALVE ACTUATORS, Job 21009, 21058, 21102 Fremont, CA 08/07/14
2:00 PM

Alder Canal 20 Inch Waterline Project El Centro, CA 08/07/14
2:00 PM

Barco Replacement Project Various Locations, CA 08/07/14
2:00 PM

CONSTRUCTION OF JOINT OUTFALL "B" UNIT 1B TRUNK SEWER REHABILITATION BETWEEN MANHOLES B42 AND B44 Rancho Dominguez, CA 08/07/14
2:00 PM

Putah Creek Parkway Davis, CA 08/07/14
2:00 PM

Sewer Group Job 795 San Diego , CA 08/07/14
2:00 PM

Sycamore Canyon Business Park Central and Southern Stormwater Treatment Basins Riverside , CA 08/07/14
2:00 PM

DMV Riverside Roof Replacement Riverside, CA 08/07/14
2:30 PM

Restore Cayucos Pier San Luis Obispo, CA 08/07/14
3:00 PM

Las Flores Canyon Creek Restoration and Park Project Phase 2 Malibu, CA 08/07/14
3:30 PM

Branciforte Drive PM 5.06 Storm Damage Repair Project Santa Cruz, CA 08/08/14
2:00 PM

Demolition of Residence at 2821 Rosedale Avenue, Soquel Soquel, CA 08/11/14
2:00 PM

Bon Air Road Bridge Replacement Project Larkspur, CA 08/12/14
10:00 AM

Tracy Municipal Airport Reconstruction of Runway 12-30 and Taxiways B, D, and E and the Runway/Taxiway Intersection Schedule A and Schedule B Tracy, CA 08/12/14
10:00 AM

BUS STOP IMPROVEMENTS Santa Clarita, CA 08/12/14
11:00 AM

Beach/Pacific (Wharf) Intersection Roundabout Santa Cruz, CA 08/12/14
2:00 PM

BIKEWAYS STRATEGY AND FEASIBILITY STUDIES FOR SUPERVISORIAL DISTRICT 3 Orange, CA 08/12/14
2:00 PM

Bollinger Canyon Road Pedestrian & Signal Improvement Project - CIP No. 5533, Federal Aid Project No. HSIP-5437(023) San Ramon, CA 08/12/14
2:00 PM

BYRON AIRPORT PAVEMENT ENHANCEMENTS Byron, CA 08/12/14
2:00 PM

Invitation for Bid for LED Streetlight Luminaires Elk Grove, CA 08/12/14
2:00 PM

West A Street Safety Improvements (West A Street at South Garden Avenue, Happyland Avenue, and Santa Clara Street-Hathaway Avenue) Hayward, CA 08/12/14
2:00 PM

Wharf 1 Guest Dock Purchase Monterey, CA 08/12/14
2:00 PM

2014 Street Resurfacing Project - City Project No. 2014-01 Livermore, CA 08/12/14
2:30 PM

Cabrillo Boulevard Bridge (Replacement) SANTA BARBARA, CA 08/12/14
3:00 PM

Natural Sciences II Re-Roof Exhaust Fan Area Santa Cruz, CA 08/12/14
3:00 PM

Federally Funded Cycle 3 Safe Routes to School (SRTS) Project Ridgecrest, CA 08/12/14
4:00 PM

2013-2014 CDBG Street Improvements for Hickory Lane, Harmony Lane and Heidi Road and ADA Footpath Improvements at Various Locations Riverside , CA 08/13/14
10:00 AM

Taxiway J Improvements West of Taxiway D Long Beach, CA 08/13/14
10:00 AM

ELK HILLS ROAD FROM SKYLINE ROAD TO ONE MILE SOUTH OF THE CALIFORNIA AQUEDUCT Buttonwillow, CA 08/13/14
11:00 AM

Kern Valley Airport perimeter fence Kern Valley, CA 08/13/14
11:00 AM

Wasco Airport perimeter road Wasco, CA 08/13/14
11:00 AM

Civic Center Playground Shade Structure Replacement Palm Desert, CA 08/13/14
2:00 PM

WWTP LEVEE REMOVAL AND IRRIGATION IMPROVEMENTS MERCED, CA 08/13/14
2:00 PM

Vicente Street and Ocean Avenue Pavement Renovation, Sewer Replacement, and Water Main Installation San Francisco , CA 08/13/14
2:30 PM

2014-2015 Sanitary Sewer Replacement Project Redwood City, CA 08/13/14
3:00 PM

DEMOLITION/ABATEMENT SERVICES RANCH LOS AMIGOS NATIONAL REHABILITATION CENTER - SITE 1 DEMOLITION AND MAKE-READY PROJECT Downey, CA 08/13/14
5:00 PM

DESIGN BUILD INSTALLATION OF NEW CONDENSING WATER PUMPS AND VALVES Los Angeles, CA 08/13/14
5:00 PM

Site Improvements for a New Propane Fueling Station at the Santa Ana Corporate Yard Santa Ana, CA 08/13/14
5:00 PM

Windows and Slider Doors Replacement Santa Barbara, CA 08/14/14
9:00 AM

2014/2015 City Wide Curb, Gutter, Sidewalk, and Driveway Repairs Riverside , CA 08/14/14
10:00 AM

Furnish and Install Chain Link Fencing and Wrought Iron Fencing on an As-Needed Basis (IDIQ) Various Locations, CA 08/14/14
1:00 PM

13-6796: CHESTNUT AVE. CLASS II BIKEWAY; STANDARD AVE TO GRAND AVE; CM-5063(148) 14-6813: ALLEY IMPROVEMENT-FY 13/14 14-6803: CHESTNUT AVE REHABILITATION; BROADWAY TO MAIN SANTA ANA, CA 08/14/14
2:00 PM

City of Perris 2014 Pavement Rehabilitation & Flood Benefit Zone Rehabilitation Project Perris, CA 08/14/14
2:00 PM

MATHER HOUSING WATER TREATMENT PLANT FILTER REHABILITATION PROJECT Sacramento, CA 08/14/14
2:00 PM

Ready-Mixed Concrete (Short Loads) Anaheim, CA 08/14/14
2:00 PM

Recycled Water Easterly Main Extension Escondido, CA 08/14/14
2:00 PM

Slope Paving, Narrow Area Paving, Valve Relocation, Access Paths, MVPs Various Locations, CA 08/14/14
2:00 PM

Tank No. 3 Glenview Replacement San Bruno, CA 08/14/14
2:00 PM

Whitewater Neighborhood Park Cathedral City, CA 08/14/14
2:00 PM

Mason Street Bridge Replacement Project, Bid No. 3588 City of Santa Barbara, CA 08/14/14
3:00 PM

Milsap Wetland Restoration Project Aptos, CA 08/14/14
4:00 PM

2014 Residential Street Rehabilitation Project Garden Grove, CA 08/15/14
1:00 PM

SODIUM HYPOCHLORITE TANK NO. 4 REPLACEMENT PROJECT El Segundo, CA 08/15/14
2:00 PM

D Street Roadway Enhancements Phase 6 Railroad Track to 10th Street Perris, CA 08/18/14
2:00 PM

Montanoso Recreation Center Locker Room Renovation Mission Viejo, CA 08/18/14
2:00 PM

City of Temecula Old Town Sewer Improvements Temecula, CA 08/19/14
10:00 AM

17th Street Public Sidewalk Improvements Santa Ana, CA 08/19/14
2:00 PM

Construction of the Rio Vista Water Treatment Plant Clearwell NO.1 Improvements Project Santa Clarita, CA 08/19/14
2:00 PM

Flooring Repair and Maintenance Services Anaheim, CA 08/19/14
2:00 PM

Network Operation Center (NOC), Administration Building B Basement Remodeling Glendale, CA 08/19/14
2:00 PM

Orange Line Fiber Optic Cabling Installation Project Phase 4 (Grossmont Center Station to Santee Town Center Station) Various Locations, CA 08/19/14
2:00 PM

STORM DRAINS CATCH BASIN SCREEN UPGRADE Gardena, CA 08/19/14
5:00 PM

Street and Traffic Signs Anaheim, CA 08/20/14
2:00 PM

Wastewater Treatment Plant Headworks Upgrade McFarland, CA 08/20/14
2:00 PM

2014 CATCH BASIN FULL CAPTURE SYSTEM Alhambra, CA 08/21/14
10:30 AM

Ahmanson Lift Station Upgrade Project - Rebid Corona, CA 08/21/14
2:00 PM

Corporation Yard Expansion Phase 2 - Materials Bin Storage Facility Project (WFC003) Elk Grove, CA 08/21/14
2:00 PM

Sacramento International Airport Reconstruct Portions of Taxiway Delta 3 Sacramento, CA 08/21/14
2:00 PM

Sixth Street Improvements, LED Trail Lighting, LED Upgrades, and Fiber Optic Repair Gilroy, CA 08/21/14
2:00 PM

WATER METER REPLACEMENT AND ENDPOINT INSTALLATION CARLSBAD, CA 08/21/14
2:00 PM

2014/2015 Palm Springs High School Concession/Field House Palm Springs, CA 08/25/14
2:00 PM

Sewer Rehabilitation and Replacement Project - Phase 1 South Pasadena, CA 08/26/14
10:00 AM

CALAVERA HILLS AND STAGECOACH COMMUNITY PARKS ATHLETIC FIELDS LIGHTING RETROFITS Carlsbad, CA 08/26/14
2:00 PM

CONSTRUCTION OF RUNWAY SAFETY AREA IMPROVEMENTS, NORTH FIELD, OAKLAND INTERNATIONAL AIRPORT, OAKLAND, CALIFORNIA, AIP 3-06-0170-(FUTURE) Oakland, CA 08/27/14
2:00 PM

Install Retaining Wall and Viaduct, and Modify Drainage System Various Locations, CA 08/27/14
2:00 PM

Apartment Complex Rehabilitation Santa Barbara, CA 08/27/14
3:00 PM

Canopy Repairs and Replacement Riverside , CA 08/28/14
2:00 PM

Pavement Rehabilitation, Replace AC with CRCP Various Locations, CA 08/28/14
2:00 PM

Construct Concrete Pavement, Precast Concrete Panels, and Slabs Various Locations, CA 09/11/14
2:00 PM

PALMDALE WATER RECLAMATION PLANT ENTRANCE GATES AND SECURITY SYSTEM Palmdale, CA 09/16/14
2:00 PM

Sludge Dewatering and Odor Control at Plant 2 Huntington Beach, CA 09/30/14
11:00 AM

Construction of Final Cover and Drainage System at the Mira Lorna Landfill Jurupa Valley, CA 10/07/14
11:00 AM

FINAL BID RESULTS POSTED SINCE Jul 22 2014 1:07PM
Vassar Avenue Reconstruction, Project 11-31 and 12-30 Mountain View, CA 07/16/14
2:00 PM

Mens Faculty Club Replace Fire Alarm System Berkeley, CA 07/18/14
2:00 PM

2014 Street Resurfacing Project Arroyo Grande, CA 07/22/14
2:00 PM

2014 Streets Resurfacing Project Various Locations, CA 07/22/14
2:00 PM

Corporation Yard Pavement Maintenance Project Windsor, CA 07/22/14
2:00 PM

Little Lake Line B Stage 1; Stetson Ave Stage 7 Hemet and San Jacinto, CA 07/22/14
2:00 PM

Madera County Jail Expansion Project Phase II Madera, CA 07/22/14
2:00 PM